Tuesday, February 4, 2014
Making a header for crown
Here are a few pictures. Ive built a basic 2x4 frame, and covered both sides with drywall. The important part is to get the drywall flush with the adjacent wall next to the coat closet. This way, the crown will run neatly past. Ive also installed a built up 2x4 on the wall, which will give a paint break, as well as allow for trimming out of the opening...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment